Design-Build Construction Explained (2024)

What is Design-Build Construction?

While similar to the more traditional design-bid-build, design-build takes a newer approach to project delivery—one that emphasizes open communication between all stakeholders, including trades and subcontractors. Design-build construction offers many advantages to owners and contractors, including improved budget estimates, quicker project completion, and better teamwork between different entities.

Unlike design-bid-build, which requires a contract for design and another for construction, design-build requires only one contract covering both the design and construction phases. The project usually progresses as an integrated process, overlapping the two phases. This speeds everything up, and a single leader—the design-builder—is responsible for meeting the contract requirements. The design-builder is also responsible for spotting inconsistencies between prescriptive requirements and performance standards and reporting those to the owner and other stakeholders.

A variant of design-build, progressive design-build (PDB) involves selecting the design-builder based on their qualifications rather than a project proposal. Many PDB owners select their design-builder before the design and project details are worked out (also called design-assist). In the PDB model, the owner works closely with the design-builder throughout all project phases, including design.

Design-Build Construction Explained (1)

The Design-Build Process

Let’s take a closer look at the design-build process and how it differs from the more traditional design-bid-build project delivery method.

In the design-bid-build method, the project owner must oversee communications with the architect, engineer, construction firm, and sometimes others. This method simplifies communication by making the design-builder the single point of contact, removing much of the project burden from the owner’s shoulders.

Design-Build Construction Explained (2)

Typical steps in the design-build process include:

1. Owner Selects Design-Builder and Team

First, the owner selects a design-builder and other needed team members. If the project is taking a progressive design-build or design-assist approach, the design-builder is chosen before any planning or design has happened. If not, the owner may choose a design-builder after working with an architect and engineer to create an initial design for the project.

2. Planning and Design

Once the entire team is on board, plans are finalized based on the owner’s budget limitations, vision, and goals. Then together, the team creates a detailed design based on these criteria. Communication remains open between the design-builder and the owner throughout the process, keeping misunderstandings and rework to a minimum.

3. Setting a Guaranteed Maximum Price (GMP)

Once project design details are in place, the design-builder seeks bids from subcontractors and trades to create a guaranteed maximum price (GMP). They then deliver it to the owner for consideration, and negotiations and design tweaks are made as needed to get the GMP and the project to the right place.

4. Construction

Construction can begin once the GMP is agreed upon and the design is finalized. Throughout the process, the owner remains in close contact with the design-builder, and the design-builder facilitates open communication with the architect, engineer, and subcontractors to maximize efficacy and minimize miscommunications. The early collaboration between stakeholders in the design-build method means that the construction process typically proceeds smoothly—and the agreed-upon GMP means there are no budget surprises for the owner.

Design-Build Construction Explained (3)

Pros of Design-Build

The design-build project delivery method offers several important benefits. Let’s look at a few:

Simplicity

In the design-build method, the entire process unites under a single agreement between owner and design-builder. Having only one contract instead of two simplifies the legal process—and also streamlines the entire project for the owner, who no longer carries the burden of managing the project. Instead, the design-builder takes on that responsibility, working closely with architects, engineers, and subcontractors to get the job done.

Cost-efficiency

Design-build involves agreeing on a set budget before the project begins. This helps avoid unexpected cost increases and keeps everyone accountable. Seeing the total sum from the beginning may give some owners sticker shock, but research shows that savings in the long term are significant.

Design-Build Construction Explained (4)

Better Communication

With the design-build model, the owner, engineer, and architect collaborate from the beginning of the project—sometimes even the design-builder is on board before the project begins and is also involved in that design process. With everyone working together to create the design and settle on a maximum budget, the better communication means the project often runs more smoothly during the construction phase as well.

Faster Completion

That open communication and additional pre-planning also manifests in faster project completion. Unlike design-bid-build, which requires time dedicated to the bidding process, design-build moves straight from the single-contract design phase to the construction phase. With everyone on a single team, the project can move forward quickly without many of the usual snags related to paperwork and contracts.

In particular, design-build can be a great fit for projects without complex designs, such as infrastructure or road projects, and any building projects that the owner and design-builder have previous experience with.

Cons of Design-Build

While the benefits of design-build are many, it’s not the best fit for every owner or construction project. Here are a few cons to consider:

Challenges of Selecting a Design-Builder

Because the design-builder carries so much responsibility in this project delivery method, it’s essential to select a qualified firm or individual to do the job. The owner should follow a detailed selection process that considers the design-builder firm’s work style compatibility, track record and experience.

Lack of Owner Control

In the design-build project delivery method, the owner must yield much of the control of design details to the design-builder and team, particularly after the design phase ends and the construction phase begins. Owners who prefer to be more hands-on throughout the construction process might not like this—while others will appreciate the relief of responsibility.

New and Unfamiliar for Some

Design-build is one of the newest project delivery methods, which means it might be new and unfamiliar territory for some owners, architects, engineers and contractors. To offset any confusion, it’s best to establish clear expectations from the outset and make sure everyone understands how the process works.

Design-Build Compared

Here’s how design-build compares to a few adjacent project delivery methods:

Design-Build Construction Explained (5)

The Impact of Design-Build on the Construction Industry

Design-build is gaining ground quickly in the construction industry, moving from a new and unfamiliar method to an industry standard. Recent market research from the Design-Build Institute of America (DBIA) anticipated that design-build would represent up to 44 percent of construction spending in 2021, having experienced 18 percent in market growth since 2018. Sectors most likely to choose the design-build method include manufacturing, highway infrastructure, and education.

The design-build approach is helping to streamline construction projects, enable more collaboration between key stakeholders, and deliver projects more quickly. Owners are embracing this method because it offers a delivery schedule that’s often much shorter than the more traditional design-bid-build framework—and because it offers other benefits as well, such as up-front cost guarantees.

Design-Build Construction Explained (6)

Examples of Design-Build Projects

Let’s look at a few examples of construction projects that utilized the design-build method, garnering accolades from the DBIA’s annual Design-Build Awards in 2021.

Design-Build Construction Explained (7)

LAX Midfield Satellite Concourse

A seven-acre, 750,000 square foot terminal project that included construction of several buildings and two tunnels beneath active taxiways, this project became the largest design-build project ever tackled at LAX.

Hyatt Regency Portland at the Oregon Convention Center

A new, 440,000 square foot hotel constructed in 26 months, adding a much-needed hotel adjacent to the Oregon Convention Center.

Design-Build Construction Explained (8)

Design-Build Construction Explained (9)

University of Washington Hans Rosling Center for Population Health

The University of Washington constructed this 300,000 square foot facility in three years, coming in 2.5 percent under the grant budget for a savings of $4.5 million.

RFK Bridge Ramp to the Northbound Harlem River Drive

A 1,400 foot-long steel and concrete ramp that connects the RFK Bridge to the Northbound Harlem River Drive in East Harlem, New York, this project was originally slated to take 18 months but dropped to an ambitious goal of 15 months—and the team still came in 50 days ahead of schedule.

Design-Build Construction Explained (10)

Design-Build Construction Explained (11)

High Desert Mental Health Urgent Care Center

A new, 9,900 square foot mental health urgent care center located in Lancaster, California, the facility was constructed in only 6.5 months.

A Connected, Cloud-Based Construction Suite Drives Success

Whether or not design-build is the construction method of choice, as contractors move toward more digitized, mobile operations, the cloud is serving as the vehicle for modern construction management. With construction-specific, connected solutions operating in the cloud, contractors can streamline their operations and work data in real time instead of days, weeks or even months later. This helps boost project productivity, and save costs and increase profitability dramatically.

A future-ready solution, Trimble has applied its two decades of construction expertise in both project management operations to build its integrated ProjectSight project management solution. ProjectSight evolved from Trimble’s Prolog project management software, which was built on a cost and budget module with an emphasis on automating processes, eliminating manual paperwork and enabling one-touch data entry.ProjectSight also includes the Trimble Connect collaboration environment, which enables architects, engineers, contractors and owners to collaborate across their construction projects.

Now is the timeto adopt a top-tier construction management system that’s designed for your projects—ProjectSight, available in Trimble Construction One. Connect with us for a free demo.

Related Resources

  • Avoid Rework with Drawing-Centric Construction Project Management Software
  • Bringing BIM into the Future of Project Management
  • Guide to Different Construction Procurement Methods
Design-Build Construction Explained (2024)

FAQs

Design-Build Construction Explained? ›

Design-build is a construction project delivery method where the designer and builder work together under a single contract from the beginning of the project in order to ensure unity and collaboration throughout the process.

How does design-build construction work? ›

In its simplest terms, the design-build construction delivery method replaces the traditional method of awarding separate contracts for design and construction. The contractor, designers, subcontractors, and owner work together as one team to build a project that meets or exceeds the owner's expectations.

What is design in building construction? ›

Broadly speaking, design is a process of creating the description of a new facility, usually represented by detailed plans and specifications; construction planning is a process of identifying activities and resources required to make the design a physical reality.

What is the difference between design-build and build only? ›

The fact that the builder assumes design responsibility usually makes design-build a higher price option than build-only contracts; however, this additional price should be compared with what it might cost for the owner to do that work themselves in a build-only contract — taking on separate design consultants, ...

What is the job description of design-build? ›

The design-builder, including the design and construction teams, should have a good understanding of the project owner's vision, the budget and any other important details. If the project plan modifies an existing building, the architects and engineers may need to consider existing floor plans and schematics.

Is design-build cheaper than design-bid-build? ›

While it might not be the cheaper option, design-build costs are often more predictable. The design-builder can wrap the whole price into a solid range that should be pretty close to the final cost, which will allow the project owner to better budget from the start.

What is the design-build process step by step? ›

The design-build process can be broken down into five main steps: team selection, project planning, design, GMP/bidding, and construction. For the most part, these steps will happen sequentially, but not necessarily independent of one another. The project planning, design, and bidding phases may overlap.

What is design and build? ›

It is a method to deliver a project in which the design and construction services are contracted by a single entity known as the design–builder or design–build contractor. It can be subdivided into architect-led design–build (ALDB, sometimes known as designer-led design–build) and contractor-led design–build.

What is the detail design stage of construction? ›

The detail design phase defines the complete specification of the geometry, materials, and tolerances of all the parts through the provision of detail drawings, assembly drawings, and general assembly drawings.

Is design-build more expensive? ›

Design/build isn't inherently cheaper or more expensive. The initial 'sticker price' may be higher, but better coordination on estimates and reduced change orders mean that the contracted price in design/build is more likely to match your final cost.

Why is design-build better? ›

Advantages of the Design-Build Process

Simplifying designing, planning, and building processes through a single point of contact. Fewer parties involved in the project mean lower costs. Fewer disputes, interruptions, and delays –making it easier to stay on schedule and meet goals.

What are the benefits of design-build method? ›

Although design build might not always be necessary, it brings numerous benefits to any project that utilizes it. The methodology reduces errors, leads to faster project delivery, keeps the costs as low as possible, and allows for a greater degree of customization.

What is the role of a design-build manager? ›

Managing a design team. Managing the design process using his/her commercial, contractual, programme/time awareness and technical expertise. Supporting, understanding and advising the client as to the requirements and his/her obligations in the development of a building design.

What is the responsibility of design and build contractor? ›

A contractor is responsible for a project's design, budget, schedule, and construction. Hence, the contractor has a more substantial influence over the project and can make choices that affect the project's outcome.

What is the role of the architect in design-build? ›

The architect usually starts their job first and will design the building, eventually producing a bid set of drawings. Builders then bid on the project based off of the drawings, and the winners take over and must adapt the architect's drawings to the realities of the site and build the building.

What are the 4 stages of construction design? ›

The construction process is typically divided into 4 essential phases: Planning, Preconstruction, Construction and Close-out.

What is the difference between progressive design-build and design-build? ›

Progressive design-build has separate contracts from the ones for traditional design-build project delivery. Firstly, there are differences in the form of contract. Some owners may sign their PDB contract with the design-builder that specifically focuses on Phase 1 Services.

What are the components of a design-build contract? ›

Components often included in a design-build contract include insurance requirements, payment terms, expectations of the contractor, and project requirements.

Top Articles
Latest Posts
Article information

Author: Greg O'Connell

Last Updated:

Views: 6200

Rating: 4.1 / 5 (42 voted)

Reviews: 89% of readers found this page helpful

Author information

Name: Greg O'Connell

Birthday: 1992-01-10

Address: Suite 517 2436 Jefferey Pass, Shanitaside, UT 27519

Phone: +2614651609714

Job: Education Developer

Hobby: Cooking, Gambling, Pottery, Shooting, Baseball, Singing, Snowboarding

Introduction: My name is Greg O'Connell, I am a delightful, colorful, talented, kind, lively, modern, tender person who loves writing and wants to share my knowledge and understanding with you.