The Design-Build Construction Method: Advantages and Drawbacks (2024)

Through the years, the construction industry has gravitated toward alternative project delivery methods like CMAR and integrated project delivery. And one of the fastest-growing delivery methods is Design-Build construction. It is known to save money and make otherwise impossible timeframes more realistic and achievable, making it an easier sell to project owners.

But should you embrace the design-build delivery method as you expand your general contracting business? In this article, we’ll discuss the benefits and drawbacks of the Design-Build construction method and whether it is a viable alternative to traditional methods, like Design-Bid-Build.

Table of Contents

What is Design-Build Construction?

Design-build construction is a delivery method that involves a single contract between the owner and the builder. Unlike traditional construction contracts, which require two separate entities: a designer and a contractor, a Design-Build contract combines these two entities. Only one company is responsible for the design and building contract for a project, removing the bidding stage.

According to the “Design-Build Utilization” report, the DB method is becoming more popular, with over half or 58% of owners planning to use it in the coming years. Because of its advantages over the traditional DBB method, it’s now permitted for public agency projects in 43 states, including New York, Virginia, and Washington.

This delivery method is used all over the world because it aims to eliminate the complexity of multiple contracts and time-consuming processes done in the traditional project delivery method.

Advantages Of Design-Build Construction

Faster delivery: Under the Design-Build method, the bidding phase is removed, and design and construction happen concurrently, resulting in faster project completion.

Smooth process: The single-source of responsibility eliminates the blame game, making conflicts easier to resolve.

Better collaboration: Because professionals collaborate in a single team, changes are addressed and communicated quickly, resulting in fewer change orders.

Cost savings: Because the actual builders are involved in the design phase, all ideas are brought to the table, ensuring prudent use of materials, a cost-effective construction process, and timely completion.

Accuracy: Project budget is established from the start, resulting in more accurate construction, reduced cost, as well as avoiding last-minute surprises.

When Design-Build Worked Best

The major benefits of Design-Build construction include streamlined communication between the contractor, subcontractors and owner, faster project completion, increased collaboration, and cost savings. As a result, DB may be appropriate for large and complex projects that require the best and quickest turnaround.

Highway and Bridge Construction

The Design-Build method is ideal for highway and bridge construction, particularly after natural disasters such as floods, hurricanes, and tornadoes, which can paralyze and distress communities. The method was proven effective when the I-35W Mississippi River Bridge collapsed on August 1, 2007. The bridge was reopened in just over a year. The Minnesota Department of Transportation saved time and avoided $400,000 in lost revenue by overlapping design and construction.

Libraries, Hospitals, and Other Public Buildings

During the design phase, some Design-Build contractors provide pre-construction services such as budgeting, value engineering, and scheduling, among other things. This approach frequently allows construction to begin before the design is completed, fast-tracking the project. Johnson County, Kan.’s emergency communication center was an example of a quick turnaround project. It can withstand an F4 tornado and has electrical and mechanical systems that can run for up to four days. It was completed seven months ahead of schedule, thanks to Design-Build construction.

When Design-Build Should Be Avoided

While this delivery method has many advantages, it is not suitable for all projects. Under DB, there could be substantial losses due to improper risk allocations. Design-Build firms limited or ended their services in specific projects due to significant losses, such as Granite Construction Inc. They announced substantial quarterly losses from fixed-price Design-Build projects forcing them to change their business strategies.

SNC-Lavalin Group also suffered losses and has stopped bidding on lump-sum construction projects. Therefore, taking note of what can be encountered can help you, as a contractor, know when to use it and when not to.

Risk Shifts To The Design-Build Team

If there are mistakes during the design or construction process, they should be resolved by the Design-Build team rather than the owner, making the firm liable for any miscalculations or delays. This puts your finances at risk because you, as the contractor, absorb the budget overages from construction reworks rather than the client. If you’re a contractor whose primary experience has been in the traditional delivery method, the single point of responsibility can be a challenge.

Owner Is Unfamiliar With Design-Build Practices

It is also not good to proceed with a design-build project if the owner is unfamiliar with Design-Build practices. Contractors are chosen using this method based on their qualifications, capabilities, experience, and price, avoiding some pitfalls associated with contract awards based solely on low prices. If the owner doesn’t understand this, it will lead to problems during the construction process.

Scope Creep

If you offer a Design-Build service, there may be ambiguous roles, especially if everyone works in-house and the entire company is responsible for the whole output. This may lead to scope creep, in which people do more than they are supposed to. As a result, your contracts must include specific descriptions that are not open to interpretation, as well as clear objectives and requirements, methodologies, and payment processes.

Contract Wording Problems

It is preferable to be as specific as possible when negotiating a Design-Build contract. When the language used in your contracts is ambiguous, it can cause problems. It may also limit your ability to use your insurance and warranty. Warranties and insurance can help general contractors deal with challenges, but gaps and ambiguity in contracts can make them difficult to use.

Best Practices for GCs When Collaborating with the Design Team

Here are some best practices for general contractors when working with the design team to ensure a successful Design-Build project.

  • Involvement of Key Players- Everyone involved in the planning and decision-making process, including the owner, architects, engineers, contractors, and subcontractors, must be kept informed and have a say. This will help everyone develop a strategy for dealing with any issues that may arise.
  • Open Lines of Communication- Regardless of the organization’s hierarchy, making everyone feel as if their opinions are valued will ensure that information flows both ways. When employees in the lower bracket can speak up, it may also lead to more project solutions.
  • Build Good Relationships- Socializing outside of work and playing team-building games could help team members form strong bonds. Strong relationships in the workplace can reduce workplace loneliness and stress, resulting in increased productivity and employee satisfaction.
  • Analyze Present Data- You can use completed projects to assess a team’s strengths and weaknesses and use them to improve construction and reduce inefficiencies.

In general, the ability of the team to function as one body is the key to good collaboration. That means information flows in a two-way direction, no one is left behind, and key players and decision-makers are capable of leading and making decisions. Without these, it is difficult to complete a project efficiently.

The Design-Build Construction Method: Advantages and Drawbacks (2024)

FAQs

What is design and build advantages and disadvantages? ›

Pricing, project clarity, and control are under much more control in a design-bid-build process, though not all project owners wish to have such a hands-on level of involvement. Some of the main drawbacks of the design-build process include: High level of trust and communication is required.

What are the disadvantages of design-build finance? ›

The owner cannot choose the design build firm based on their own price because there is no bidding process. As a result, the pricing in this area tends to be greater. Furthermore, no Design-build business begins work until they are under contract, making it difficult for the owner to compare.

What is an advantage of design-build construction contracting? ›

In a design-build environment where all parties are required to work in unison, an atmosphere of collaboration is fostered. This limits uncertainty and eliminates mistakes that can adversely affect the project. Completion time: Speed to completion is almost always a factor when choosing a design-build system.

What are the advantages of design bid build method? ›

The design-bid-build delivery model allows owners to retain more control of the project. The owner can choose preferred design and construction teams separately, not having to settle for a prepackaged design-build team.

What is the design-build method? ›

Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the project owner to provide design and construction services. One entity, one contract, one unified flow of work from initial concept through completion.

Is design-build cheaper than design-bid-build? ›

Many assume Design-Bid-Build is the best option as it allows for choosing the lowest bidder(s) for the project. However, Design-Build can also be cost effective because it involves the general contractor and designer from the beginning and can eliminate design changes further into the projects' construction.

Does design-build cost more? ›

Design/build isn't inherently cheaper or more expensive. The initial 'sticker price' may be higher, but better coordination on estimates and reduced change orders mean that the contracted price in design/build is more likely to match your final cost.

What are the risks of construction design? ›

Design risks can be broadly classified into deficiencies that violate statutory, safety, and environmental requirements and those that result in a project failing to meet its intended purpose, leading to operational and maintenance challenges.

What is design and build risk? ›

Design and Build is a relatively low risk procurement option for the employer, in terms of cost and time. There can be a risk related to design and quality, particularly if the employer's requirements were not properly gathered and if insufficient time went into examining the contractor's proposal.

What are the risks of design and build procurement? ›

The most common construction risk in DB projects is the degree of geotechnical investigation since the design stage is under contractor responsibility [16]. In some cases, a geotechnical survey has not been conducted due to time limitation before contract signing.

When should design-build be used? ›

Project Size

Though projects of all sizes can benefit from the design-build method, larger projects are typically most suited for applying the approach due to their complexity and schedule-driven challenges.

When would you use design and build? ›

Design and build can be seen as giving a single point of responsibility for delivering the entire project. Some clients, however, consider it is only appropriate for simple projects, where design quality is not the main consideration.

What is the purpose of design in construction? ›

One of the major benefits of construction design is that it enhances the overall functionality of the entire building. It ensures that each component of the building is optimized to serve its intended purpose. Creating functional spaces helps to improve the efficiency and value of the finished product, as well.

What is design and build? ›

In its simplest terms, the design-build construction delivery method replaces the traditional method of awarding separate contracts for design and construction. The contractor, designers, subcontractors, and owner work together as one team to build a project that meets or exceeds the owner's expectations.

What are the advantages of two stage design and build? ›

The two-stage procurement process promotes collaborative working and significantly de-risks the project for all stakeholders, providing greater cost and programme certainty as the design has been fully developed collaboratively between all parties.

What is the design and build concept? ›

In contrast to "design–bid–build" (or "design–tender"), design–build relies on a single point of responsibility contract and is used to minimize risks for the project owner and to reduce the delivery schedule by overlapping the design phase and construction phase of a project.

What is the importance of building design? ›

Good architectural design is not only important for cost and beauty, but it is very important for the health of the occupants. Every design detail must be considered carefully because it will make a difference in the day-to-day life of those who will be utilizing the space.

Top Articles
Latest Posts
Article information

Author: Nicola Considine CPA

Last Updated:

Views: 6093

Rating: 4.9 / 5 (49 voted)

Reviews: 88% of readers found this page helpful

Author information

Name: Nicola Considine CPA

Birthday: 1993-02-26

Address: 3809 Clinton Inlet, East Aleisha, UT 46318-2392

Phone: +2681424145499

Job: Government Technician

Hobby: Calligraphy, Lego building, Worldbuilding, Shooting, Bird watching, Shopping, Cooking

Introduction: My name is Nicola Considine CPA, I am a determined, witty, powerful, brainy, open, smiling, proud person who loves writing and wants to share my knowledge and understanding with you.